久久国产精品波多野结衣av-人人妻人人爽人人澡av-国产手机精品一区二区-蜜臀av性久久久久蜜臀aⅴ

Welcome to zhongying water supply Hunan, China Website
Your Position: Home > Experts > Service Center

How to prolong the service life of non negative pressure water supply equipment

2017/2/28??????view:

How to prolong the service life of non negative pressure water supply equipment


    As everyone knows, the water pump is used as the core component of non negative pressure water supply equipment, is the key to non negative pressure water supply equipment can operate normally, in addition to the principle of centrifugal pump related knowledge, we have more important is how to conduct the related maintenance of our water pump, to prolong the service life of the water pump non negative pressure water supply equipment, from below the following details should pay attention to what matters to prolong the service life of the water pump.
Preparation of non negative pressure water supply equipment before starting:
1, test motor steering is correct, from the top of the motor to the pump as a clockwise rotation, the test time should be short so as to avoid mechanical seal dry wear.
2, open the exhaust valve to fill the entire pump body, to be closed after the exhaust valve.
3, check each part is normal.
4, with the hand disc pump to make the lubricating liquid into the mechanical seal face.
5, the high temperature type should first run preheating, heating rate of 50 C / h, in order to ensure that each department is heated evenly.
Non negative pressure water supply equipment start:
1, fully open inlet valve.
2. Close the valve.
3, start motor, observe whether the pump is running correctly.
4, adjusting the outlet valve opening to the desired condition, such as the user is equipped with flow or pressure meter at the outlet of the pump, it should adjust the outlet valve opening in the pump performance parameter table rated point operation, if the user is not installed in the pump outlet flow or pressure meter, it should adjust the outlet valve opening; the motor current measuring pump, the motor runs in the rated current, otherwise it will cause the pump overload operation (i.e. current operation, to make the motor burned out) adjustable outlet valve opening is large and small and pipeline related conditions.
5, check the seal leakage, normal mechanical seal leakage should be less than 3 drops per minute.
6, check the motor, bearing temperature rise at less than 70 DEG C.
Non negative pressure water supply equipment shutdown:
1, high temperature before cooling, the cooling rate is not higher than 10 deg / min, the temperature is lowered to below 80 DEG C, to stop.
2. Close the valve.
3, stop motor.
4, close the inlet and outlet valve.
5, such as long-term shutdown, the pump should be put into the liquid.
Through the above several operations related to the maintenance, I believe the pump service life will be greatly extended, better play its due function.







Name: *
tel: *
Question: *
leave your message
圖片看不清?點(diǎn)擊重新得到驗(yàn)證碼
主站蜘蛛池模板: 久久久精品国产sm调教网站| 亚洲欧美日韩中文高清www777| 国产精品亚洲аv无码播放| 中文无码一区二区三区在线观看 | 八戒网站免费观看视频| 丰满少妇作爱视频免费观看| 国产精品xxxx国产喷水| 四虎国产精品永久入口| 亚洲字幕av一区二区三区四区| 51福利国产在线观看午夜天堂| 久久成人麻豆午夜电影| 国产真人作爱免费视频道歉| 久久久久久久99精品国产片| 久久精品国产亚洲avapp下载| 欧洲熟妇色| 国内自拍五区| 亚洲电影区图片区小说区| 中文字幕在线亚洲精品| yw尤物av无码国产在线观看| 午夜亚洲av永久无码精品| 精品性高朝久久久久久久| 亚洲欧美日韩综合一区| 少妇被躁爽到高潮无码人狍大战| 天天夜碰日日摸日日澡| 国产农村妇女毛片精品久久| 欧美黑人巨大xxxxx视频| 国产精品久久精品第一页| 久久99国产乱子伦精品免费| 国产精品无码a∨精品影院| 国产中老年妇女精品| 强行交换配乱婬bd| 国产呻吟久久久久久久92| 抓住我的双乳咬我奶头视频看| 午夜影院0606免费| 国产乱子夫妻xx黑人xyx真爽| 日本黄页网站免费大全| 香港曰本韩国三级网站| 欧美人善交videosg| 精产国品久久一二三产区区别| 人妻免费久久久久久久了| 国产日产欧产综合 |